Engineer

The engineering foundation your operations will run on.

PREMIS turns evolving project engineering data into a validated asset register: plant hierarchy, technical attributes, documents, spare parts, and the inspection and maintenance plans your teams will inherit. Ready for commissioning, and built to keep evolving afterwards.

premis · project dashboard
The PREMIS project dashboard
Offshore platform structure

The stakes

Early decisions have lifetime consequences.

What is engineered now is what operations inherit, and three things make that engineering hard to control.

01EPC data that never stops moving

Engineering deliverables change as the project progresses, and every revision has to be tracked and applied.

02Collaboration spread across contractors

Data and documents pass through several disciplines and companies, which creates rework, delays and inconsistencies.

03Specialist expertise that is getting scarce

Inspection, maintenance and spare-parts strategies depend on expertise that is increasingly hard to find and expensive to keep.

The workflow

From contractor deliverables
to a register your systems can load.

01Project management

Incoming deliverables, their progress, and the share of scope coveredDELIVERABLESP&IDs184Datasheets96Vendor manuals4162%IN SCOPE

Source collection and scoping

P&IDs, datasheets, vendor manuals, with the project scope set on deliverables and their progress.

02TOPO Builder

The functional structure of the plant, from site to equipmentFUNCTIONAL STRUCTUREPlantUnit 100Unit 200P-101 PumpV-204 VesselE-330 ExchangerT-410 Tank

Asset hierarchy

The functional structure of the plant, built from the selected documents.

03Documentation

One document, the tags extracted from it, each traceable back to itDOCUMENTP-101V-204E-330

Attributes, classification and documentation

Every tag enriched and traceable back to the document it came from.

04Spare parts

The same part held in stock twice, with its characteristicsSPARE PART2 IN STOCKCHARACTERISTICSMaterial316LRatingCL150Size24 inRedundancy2 x 50%

Spare parts

Parts and BOMs linked to the equipment, with a stock strategy driven by criticality and redundancy.

05Preventive plan

Preventive tasks repeating at their own frequency on one validated baseEVERYTASK6MLubrication1YVisual inspection2YThickness readings5YInternal inspectionVALIDATED ASSET BASE

Inspection and maintenance plans

Preventive plans, lubrication, CMLs, corrosion loops and isolation plans, on a validated base.

06Data management

The register, quality-checked and reconciled, delivered to the target systemREGISTERDELIVERED TOCheckedReconciledSAPMaximoOPERAON SCHEDULE

Delivery and integration

Exported for SAP, Maximo, or OPERA: quality-checked, reconciled, delivered on schedule.

Productivity

The work you no longer
do by hand.

Extraction, revisions, progress and deliverables are handled inside the tool, on the register itself, so the engineering data keeps up with the project instead of trailing it.

Tag recognition Automated extraction from P&IDs.
Documentation management Revision updates, linked to the corresponding tags.
Dashboard Progress tracking across engineering studies.
Engineering templates Standardized deliverables.

AI-powered productivity

AI where the volume makes manual work unrealistic.

AI Premium Setup Time gained at setup

Our extraction solution identifies and describes every tag, populates its characteristics and links its documentation. A single pass, at the start of the project.

Subscription Performance held through the project

Agents keep working as the project runs: automatic tag-to-document linking, characteristics extraction, and TOPO optimization.

How it fits

PREMIS fits into your engineering or re-engineering project however the scope is held: run by in-house teams and their specialist subcontractors, by the maintenance and inspection engineering contractor, or embedded within the EPC’s own scope.

Whoever holds the engineering scope,
the operator keeps the asset foundation.

Continuity

From PREMIS to OPERA,
without a handover gap.

The foundation built during the project lives on in operations, inside OPERA. Field data (inspection, maintenance, construction, HSE) keeps it current, so the initial studies evolve with the asset instead of ageing against it. No gaps, no rekeying, and one point of contact from the first document to daily operations.

opera · dashboard
The OPERA work order dashboard

Re-engineering

PREMIS Re-Engineering rebuilds the data foundation for life-extension and brownfield projects.

For assets that have been in operation for years, the engineering register is often incomplete, inconsistent or no longer aligned with the physical plant. Before a re-engineering, modification or life-extension program can move forward with confidence, that foundation may need to be rebuilt.

A DIAG+ assessment can identify the maturity and reliability of the available data. Where remediation is required, PREMIS Re-Engineering enables operators and contractors to reconstruct a trusted asset register from existing engineering documentation: P&IDs, datasheets, equipment lists and historical records.

With AI Premium Setup, tags can be identified, described, classified, populated and linked to their supporting documentation at scale. The result is a structured, traceable and operations-ready register that provides a reliable starting point for re-engineering work and life-extension planning.

An offshore asset in operation